Overview
What this service covers and when to book
When the mains fails in an occupied building, people have to find their way out in the dark — often through a corridor they have walked a hundred times but never in blackness, and never among others trying to do the same. Emergency lighting exists for those few minutes, and it is the one system in a building that is almost never used and must work perfectly the first time it is. Urgent Electrical Services designs, installs and tests emergency lighting across Nottingham and the East Midlands to BS 5266, with the layout driven by the escape routes in your fire risk assessment rather than by fitting a light every so many metres. Illuminating an escape route properly means covering the points that actually matter: every change of direction, each staircase and step, final exits, and the locations of call points and firefighting equipment. Open areas above a certain size need anti-panic lighting so people can reach a defined route at all, and high-risk task areas need enough light for machinery to be shut down safely. We install maintained fittings, which stay lit at all times and suit places of assembly, and non-maintained fittings, which illuminate only when the supply fails and suit offices and workplaces. Self-contained units with integral batteries are the usual choice, while central battery systems are worth considering on larger sites where testing dozens of individual fittings becomes the real cost. Getting the design right is what avoids the two common failures: too few fittings to satisfy an inspector, or a system so oversized that annual testing becomes a burden nobody keeps up. Every installation is commissioned with photometric compliance confirmed and handed over with certification and a logbook. We interface systems with Fire Alarm Installation where activation must trigger lighting, keep Access Control Installation lit at their release points, and can complete any accompanying Electrical Certificates in the same visit. Ongoing compliance is covered by Emergency Lighting Periodic Inspection and Testing, which BS 5266 requires monthly and annually.